Urgency and Importance Based Repair Task Prioritization Template

More mechanical-engineering templates

Ensure crucial machinery remains operational by prioritizing urgent repair tasks with this template. This project is designed to minimize costly machine downtime in the mechanical engineering industry.

Follow the step-by-step tasks to diagnose issues, order necessary parts, and perform timely repairs, ensuring your machinery is always up and running efficiently.

Get this template on priority matrix

Urgency and Importance Based Repair Task Prioritization for Priority Matrix

Urgency and Importance Based Repair Task Prioritization in Priority Matrix

Prioritize urgent repair tasks to minimize machinery downtime and operational losses.

You can start using Urgency and Importance Based Repair Task Prioritization or other Mechanical-Engineering Project Templates with Priority Matrix in just a few steps:

  1. Click to sign in or create an account in the system
  2. Start adding your items to the matrix
  3. If you prefer to use the Mac and Windows app download Priority Matrix and take your data with you
If you have any questions and you can't find the answer in our knowledge base, don't hesitate to contact us for help.


Proposed Tasks

Urgent and Important

  • Task 1: Repair Hydraulic Press (due in 1 day)
    ☐ Diagnose issue with hydraulic press ☐ Order necessary parts ☐ Perform repair
  • Task 5: Repair Air Compressor (due in 1 day)
    ☐ Diagnose issue with air compressor ☐ Order necessary parts ☐ Perform repair
  • Task 11: Fix CNC Machine (due in 1 day)
    ☐ Identify issue with CNC machine ☐ Repair or replace parts as necessary
  • Task 17: Repair Guillotine Shear (due in 1 day)
    ☐ Diagnose issue with guillotine shear ☐ Order necessary parts ☐ Perform repair
  • Task 3: Fix Conveyor Belt (due in 2 days)
    ☐ Identify issue with conveyor belt ☐ Repair or replace parts as necessary
  • Task 9: Repair Welding Machine (due in 2 days)
    ☐ Diagnose issue with welding machine ☐ Order necessary parts ☐ Perform repair
  • Task 13: Repair Laser Cutting Machine (due in 2 days)
    ☐ Diagnose issue with laser cutting machine ☐ Order necessary parts ☐ Perform repair
  • Task 19: Fix Ironworker Machine (due in 2 days)
    ☐ Identify issue with ironworker machine ☐ Repair or replace parts as necessary
  • Task 7: Fix Drill Press (due in 3 days)
    ☐ Identify issue with drill press ☐ Repair or replace parts as necessary
  • Task 15: Fix Plasma Cutting Machine (due in 3 days)
    ☐ Identify issue with plasma cutting machine ☐ Repair or replace parts as necessary

Important, Not Urgent

  • Task 2: Regular Maintenance of Lathe Machine (due in 1 week)
    ☐ Perform routine check on lathe machine ☐ Replace worn out parts ☐ Test machine functionality
  • Task 14: Regular Maintenance of Water Jet Cutting Machine (due in 1 week)
    ☐ Perform routine check on water jet cutting machine ☐ Replace worn out parts ☐ Test machine functionality
  • Task 18: Regular Maintenance of Turret Punch (due in 1 week)
    ☐ Perform routine check on turret punch ☐ Replace worn out parts ☐ Test machine functionality
  • Task 10: Regular Maintenance of Grinder Machine (due in 10 days)
    ☐ Perform routine check on grinder machine ☐ Replace worn out parts ☐ Test machine functionality
  • Task 6: Regular Maintenance of Milling Machine (due in 2 weeks)
    ☐ Perform routine check on milling machine ☐ Replace worn out parts ☐ Test machine functionality
  • Task 12: Clean and Lubricate Planer Machine (due in 2 weeks)
    ☐ Clean all parts of the planer machine ☐ Apply lubricant to moving parts
  • Task 16: Clean and Lubricate Router Machine (due in 2 weeks)
    ☐ Clean all parts of the router machine ☐ Apply lubricant to moving parts
  • Task 4: Clean and Lubricate Gearbox (due in 3 weeks)
    ☐ Clean all parts of the gearbox ☐ Apply lubricant to gears
  • Task 8: Clean and Lubricate Band Saw (due in 1 month)
    ☐ Clean all parts of the band saw ☐ Apply lubricant to moving parts
  • Task 20: Clean and Lubricate Tube Benders (due in 1 month)
    ☐ Clean all parts of the tube benders ☐ Apply lubricant to moving parts