Template Project for Lighting Installation Preparation

More lighting-design templates

Ensure a successful lighting installation with this detailed template. By meticulously reviewing all relevant documentation and site plans, you can develop a comprehensive strategy for your project. This template guides you through each step, from reviewing site plans and assessing lighting requirements to scheduling installations and conducting post-installation reviews.

Organize and streamline your lighting design process to increase efficiency and ensure a flawless implementation.

Get this template on priority matrix

Template Project for Lighting Installation Preparation for Priority Matrix

Template Project for Lighting Installation Preparation in Priority Matrix

Prepare your lighting installation project with a comprehensive strategy and detailed tasks to ensure success.

You can start using Template Project for Lighting Installation Preparation or other Lighting-Design Project Templates with Priority Matrix in just a few steps:

  1. Click to sign in or create an account in the system
  2. Start adding your items to the matrix
  3. If you prefer to use the Mac and Windows app download Priority Matrix and take your data with you
If you have any questions and you can't find the answer in our knowledge base, don't hesitate to contact us for help.


Proposed Tasks

High Impact, Urgent

  • Task 1: Review Site Plans (due in 1 day)
    ☐ Study the architectural layout ☐ Analyze the electrical infrastructure ☐ Identify possible lighting locations
  • Task 2: Assess Lighting Requirements (due in 3 days)
    ☐ Identify the lighting needs for each area ☐ Calculate the required lumens ☐ Select appropriate lighting fixtures
  • Task 9: Oversee Installation (due in 1 month)
    ☐ Ensure adherence to installation plan ☐ Address any issues that arise ☐ Ensure installation is completed on schedule

High Impact, Less Urgent

  • Task 3: Create Lighting Design (due in 1 week)
    ☐ Sketch preliminary design ☐ Finalize lighting positions ☐ Prepare final design and layout
  • Task 4: Prepare Cost Estimate (due in 10 days)
    ☐ List necessary materials and equipment ☐ Calculate labor costs ☐ Prepare final cost estimate
  • Task 10: Conduct Post-Installation Review (due in 5 weeks)
    ☐ Inspect installation for quality ☐ Make any necessary adjustments ☐ Sign off on completed installation

Low Impact, Urgent

  • Task 5: Source Lighting Fixtures and Materials (due in 2 weeks)
    ☐ Identify potential suppliers ☐ Request quotes ☐ Order materials
  • Task 6: Schedule Installation (due in 2.5 weeks)
    ☐ Coordinate with site manager ☐ Arrange for necessary permits ☐ Schedule installation crew

Low Impact, Less Urgent

  • Task 7: Prepare Installation Instructions (due in 3 weeks)
    ☐ Write detailed step-by-step instructions ☐ Prepare diagrams and blueprints ☐ Compile into an installation manual
  • Task 8: Conduct Pre-Installation Meeting (due in 3.5 weeks)
    ☐ Review installation plan with crew ☐ Address any questions or concerns ☐ Finalize installation schedule