Jib Operator Shoot Preparation Template

More film-and-television-production templates

Prepare effectively for your upcoming film and television shoots with this comprehensive template designed specifically for jib operators. This template guides you through reviewing your equipment, studying the shooting script, planning transportation, and more.

By following these steps, you can ensure that you are fully prepared for any challenges that may arise during your shoot, leading to a smoother and more successful production process.

Get this template on priority matrix

Jib Operator Shoot Preparation for Priority Matrix

Jib Operator Shoot Preparation in Priority Matrix

Ensure a successful shoot by organizing and reviewing all necessary equipment and strategies.

You can start using Jib Operator Shoot Preparation or other Film-And-Television-Production Project Templates with Priority Matrix in just a few steps:

  1. Click to sign in or create an account in the system
  2. Start adding your items to the matrix
  3. If you prefer to use the Mac and Windows app download Priority Matrix and take your data with you
If you have any questions and you can't find the answer in our knowledge base, don't hesitate to contact us for help.


Proposed Tasks

High Priority, Immediate Tasks

  • Task 1 due in 2 days: Review Equipment List
    ☐ Check the condition of all equipment ☐ Make a list of any necessary repairs or replacements ☐ Order any necessary equipment
  • Task 2 due in 1 week: Review Shooting Script
    ☐ Read through the script ☐ Note any potential challenges or difficulties ☐ Discuss any issues with the director
  • Task 7 due in 1 week: Test Equipment
    ☐ Test all equipment before the shoot ☐ Make any necessary adjustments
  • Task 5 due in 2 weeks: Create a Shooting Schedule
    ☐ Create a detailed shooting schedule ☐ Coordinate with other team members ☐ Ensure that all necessary tasks are included

High Priority, Long-Term Tasks

  • Task 4 due in 1 week: Plan Equipment Transportation
    ☐ Plan for the transportation of the equipment to the location ☐ Ensure that all equipment is properly packed and protected
  • Task 9 due in 1 week: Review Safety Procedures
    ☐ Review all safety procedures ☐ Ensure that all crew members are familiar with them

Low Priority, Immediate Tasks

  • Task 3 due in 1 day: Check Weather Forecast
    ☐ Check the weather forecast for the shooting days ☐ Plan for any necessary adjustments
  • Task 8 due in 2 days: Confirm Crew Availability
    ☐ Confirm the availability of all crew members ☐ Make any necessary adjustments
  • Task 6 due in 3 days: Study the Location
    ☐ Study the location of the shoot ☐ Plan for any necessary adjustments

Low Priority, Long-Term Tasks

  • Task 10 due in 2 weeks: Prepare Backup Plan
    ☐ Prepare a backup plan in case of unforeseen circumstances ☐ Ensure that all crew members are familiar with the plan